Tailings design, analysis & drawings

Develop a tailings engineering package from the design basis through analysis, drawings and construction requirements. Discuss new facilities, staged raises, changes to existing assets and closure options around the decisions your team needs to make.

Discuss this service ↗
Tailings storage and perimeter embankment near Butte, Montana
Illustrative industry photography · USGS / Public domain · Image information

Technical work packages

The work, from
start to finish.

These packages help define the engagement from the initial brief to its deliverables. The agreed proposal identifies which items, specialists and responsibilities are included in your project.

01

Concept and options

Compare facility arrangements, staging and material choices against site constraints and the agreed objectives.

02

Design development

Connect the ground model, parameter selection, analysis cases and engineering drawings.

03

Construction documentation

Define technical specifications, inspection requirements, hold points and the records needed to verify the work.

04

Change and review

Assess proposed changes against the design basis and document the decision and review responsibilities.

The engagement

What the work
can involve.

We tailor the scope to the decision you need to make, the available information and the project stage.

Illustrative discussion of drawings and technical documents
  1. 01

    Establish the facility stage, design objectives, criteria, site knowledge and operational constraints.

  2. 02

    Develop and compare geometry, embankment, foundation, drainage and staging options within the agreed design scope.

  3. 03

    Coordinate stability, seepage, deformation and water-management inputs with the relevant specialists.

  4. 04

    Prepare or review drawings, specifications and design reports, and track technical changes through review.

Agreeing responsibilities

The engagement defines the responsible designer, checking arrangements and construction-release process. Hydrology, geochemistry, environmental studies and other specialist inputs are identified explicitly.

The output

Defined work.
Useful deliverables.

  • Design-basis report and data-gap register
  • Options assessment and scoped calculation package
  • Layouts, sections, details and specifications
  • Technical review responses and design-change register

What to bring to the first discussion

Survey and as-built surfaces, existing design reports, material testing, deposition plans, monitoring records and the required project decision.

You can start with an outline of the information you have. We will agree the document list and transfer method before you send confidential material.

Before you enquire

A clearer conversation
from the start.

Make a preparation checklist ↗
What information should I prepare?

Survey and as-built surfaces, existing design reports, material testing, deposition plans, monitoring records and the required project decision. You can begin with a short summary and a list of the documents available.

How will the work be priced?

The proposal is based on the agreed tasks, available information, deliverables, site requirements and review effort. Formal appointments and specialist inputs are scoped separately. No price is confirmed by this website.

Can I enquire with incomplete information?

Yes. Tell us the decision or outcome you need and what is still unknown. We can discuss the information and professional input needed before the scope and timing are agreed.

Working together

A scope you can review.

The proposal identifies tasks, deliverables, inputs, dependencies, exclusions and pricing. Open questions remain visible so the next decision is informed.